EcoSpold 1 ยท Calculation comparison

BAFU 2026 v1, Mineral resources

A comparison of published impact results with VoLCA calculations from the same source data and the same method, in the implementation named below. Points on the diagonal agree.

This page shows engine v0.16.0, which is not the newest measured. Compare the engine versions, or see the current comparisons.

Engine version
volca 0.16.0 (73b86ac, v0.16.0, linux)
Measured on
Comparison measurements and reference
DatabaseBAFU 2026 v1
Source formatEcoSpold 1
Impact method collectionEcological Scarcity 2021
Method implementationecoinvent 3.12
Impact categoryMineral resources
UnitUBP
Activities compared11,660
Median ratio (VoLCA / published)0.9999
Comparison band1%
Activities outside the band300
Share outside the band2.57%
VerdictAgrees: meets the agreement a release is held to
Points drawn2,106
Largest relative deviation-98.47%
Activity with largest deviationEpoxy resin, liquid, disaggregated data, at plant
Published referenceBAFU-2026 v1 LCIA Results_corrected.xlsx
BAFU 2026 v1, Mineral resources
Each point is one activity: what BAFU 2026 v1 published for Mineral resources (UBP), against what VoLCA computes from the same EcoSpold 1 source under the Ecological Scarcity 2021 factors of ecoinvent 3.12. The black line is equality and the grey band is 1%. 11,660 activities were compared; 300 fall outside the band, more than a picture can hold, so 1,944 of the 11,660 are drawn, evenly spaced over the published value whichever side of the band they fall, and the 162 of the 200 farthest from equality that this walk missed are added. Where several fall on one spot, at most three markers are drawn there, since a fourth would not darken it. Median ratio 0.9999, 2.57% outside the band. This meets the agreement a release is held to: at most 5% of activities outside the band and a median ratio inside it.